PhysElec Solutions was engaged to provide earthing and lightning protection for an advanced bird radar detection system installed at Musselroe Wind Farm in Tasmania’s far north-east. Soil resistivity and earthing design was carried out, along with a freestanding lightning protection design employing a corona minimising air terminal and insulated downconductor system. Following the installation of earthing and lightning protection, current injection testing was carried out to verify system performance.
Agriculture
Farms operate across large open areas with interconnected buildings and automated equipment.
